Products

Add Installation Elevator

The use of various advanced energy-saving and intelligent technology developments has reduced elevator operating costs and
passenger flow transportation more efficiently and smoothly. MASTON has worked with construction developers to create green buildings.





  Construction time

Steel structure installation completed in 1 day,and the project



  Anti-rust treatment

Rust removal,degreasing,13 procedures,electrophoreic dipping (domesic initiatve)



  Well size

Optimized design,small footprint, small impact on low-rise residental lighting

text down

  • MASTON Add Installation Elevator.pdf

    down